Build log · updated monthly

What actually shipped.

Every "In build" label on this site should be checkable. This is the dated record — milestones only, nothing we haven't actually built, written when they land.

October 2026

Early access opens; pricing published

  • • This website, with the full module catalog, published USD pricing and the working cost calculator.
  • • Early-access intake opened; design-partner group forming.
  • • Platform work continues on Module 01 — device scoring and the scoring rule engine.

September 2026

Scope and pricing locked

  • • Full build specification completed — every module defined so the engineering team builds without guesswork.
  • • Locked the scoring approach and cut anything we can't stand behind: no failure-probability percentages, no "live" resale values, no blanket warranty promises.
  • • The module catalog settled at 21 modules across five pillars, each with its build status.

April 2026

Platform core accepted; device scoring started

  • • Platform foundation passed its acceptance checklist (5 April 2026): multi-tenant provisioning, authentication with required MFA, role-based access control, audit logging, registration codes, email infrastructure.
  • • Access-control views, tenant directory and platform administration landed in our internal build.
  • • Work began on Module 01: device registry, scoring engine and lifecycle recommendations.

March 2026

Foundations

  • • AngiLabs started building, with separate demo and live environments from day one.
  • • First product (client reporting for agencies) ran live and taught us the lesson Lilo is built on: the deliverable your client can hold is the product.

Next entry lands when the next milestone does. If a month passes without one, nothing shipped.

Watch it get built — from the inside.

Design partners see the build as it happens and shape what ships next.