Build log · updated monthly
What actually shipped.
Every "In build" label on this site should be checkable. This is the dated record — milestones only, nothing we haven't actually built, written when they land.
October 2026
Early access opens; pricing published
- • This website, with the full module catalog, published USD pricing and the working cost calculator.
- • Early-access intake opened; design-partner group forming.
- • Platform work continues on Module 01 — device scoring and the scoring rule engine.
September 2026
Scope and pricing locked
- • Full build specification completed — every module defined so the engineering team builds without guesswork.
- • Locked the scoring approach and cut anything we can't stand behind: no failure-probability percentages, no "live" resale values, no blanket warranty promises.
- • The module catalog settled at 21 modules across five pillars, each with its build status.
April 2026
Platform core accepted; device scoring started
- • Platform foundation passed its acceptance checklist (5 April 2026): multi-tenant provisioning, authentication with required MFA, role-based access control, audit logging, registration codes, email infrastructure.
- • Access-control views, tenant directory and platform administration landed in our internal build.
- • Work began on Module 01: device registry, scoring engine and lifecycle recommendations.
March 2026
Foundations
- • AngiLabs started building, with separate demo and live environments from day one.
- • First product (client reporting for agencies) ran live and taught us the lesson Lilo is built on: the deliverable your client can hold is the product.
Next entry lands when the next milestone does. If a month passes without one, nothing shipped.
Watch it get built — from the inside.
Design partners see the build as it happens and shape what ships next.